Project typeNew construction
Square feet21,305
ClientStillwater Church
Capacity262 seats
Site10.4 acres
Great West Construction partnered with Stillwater Church to build a new 21,305 sq. ft. home for their growing congregation on a 10.4-acre site in Loveland. This ground-up, two-story project pairs wood-frame construction with a structural steel system, including the dramatic curved steel that shapes the building’s signature roofline. The upper level holds a 262-seat sanctuary alongside adult classrooms and Church offices, while the lower level was purpose-built for Lionheart Children’s Academy — classrooms the Church shares for its own ministry on weekends.
Scope
Two-story wood-frame building with structural steel system Curved structural steel roofline 262-seat sanctuary Adult classrooms and church offices Lower level built for Lionheart Children’s Academy Site work on a 10.4-acre parcelMore projects
Planning a commercial project?
719-380-8100
